Forecast waste arisings for your construction project, and select actions to reduce and recovery construction wastes. This information can be used to create a Site Waste Management Plan.
Assess the level of recycled content in your construction project and to identify the most significant opportunities to use more recycled materials without increasing cost.
The tool can be used at an early stage in the development process to estimate the likely level of waste arisings produced by, and the recycled content incorporated within an outline design / specification. It can also be used throughout the development process, contributing to site waste management planning, and ultimately enabling a user to demonstrate how a project achieves a specific level of waste reduction and/or recycled content.